Home » Trials » SLCTR/2020/005 » Progress Reports
Date Modified
2020-08-12
Period
6/months
Report Summary
Early termination of the study as decided by the sponsor. Termination decision not related to safety and efficacy of the study drug. Local date of the end of the trial 10.06.2020. Global date of the end of the trial 22.06.2020
Attached file